Apply for Land Allotment
Captive Renewable Microgrid
Reliable. Clean. Sustainable.
Strategic Location Thatta, Sindh
Near Port Qasim & Industrial Corridors
Government Backed STZA Approved
Enabling policies & investor protection
Sustainable Future LEED Gold Vision
Green campus for a better tomorrow
Macro Investment Horizon

Why Invest in Pakistan's Tech Transformation?

Positioned at the nexus of the CPEC Maritime Corridor and South Asian trade routes, Pakistan represents one of the fastest-growing industrial technology markets.

60%

Clean Energy Transition by 2030

National policy mandates 60% clean energy capacity by 2030, creating a $15B+ market for solar PV, BESS, wind, and green hydrogen manufacturing.

CPEC

Strategic Port Qasim Logistics Hub

Direct proximity to Port Qasim deep-sea container terminal enables duty-free import of silicon raw materials and rapid export to GCC & European markets.

100M+

Youth & Engineering Talent Pool

Access to over 100 million youth under age 25 with 35,000+ STEM and engineering graduates entering the workforce annually at highly competitive labor rates.

100%

Sovereign Dividend Repatriation

Protected by federal STZA laws, foreign investors enjoy 100% foreign equity ownership and unrestricted profit & capital dividend repatriation.

Developer & STZA Recognition

Developing Pakistan's Flagship STZ Destination

Foundation Renewable & Technology Zone (FRTZ) is conceptualized and executed by FonGreen Silicon Technologies Ltd. (FoST) as a 202.22-acre STZA-approved Special Technology Zone.

STZA Approved & Investment-Ready

FRTZ provides a benchmark framework combining captive 220kV renewable microgrid power, Tier-4 green data centre infrastructure, and LEED Gold environmental design.

STZA Special Technology Zone License Approved
202.22 Acres Fully Acquisitioned Land Area
75% Primary Utilities & Road Networks Completed
10-Year Income Tax Holiday & 0% Customs Duty
Official FRTZ Smart Entrance Gateway
Official Architectural Gate Design

Foundation Renewable & Technology Zone Entrance

Sovereign Legal Advantages

Unrivaled Financial & Tax Exemptions

FRTZ operates under parliamentary Special Economic Zone laws, offering investors sovereign protection and financial tax exemptions.

10-Year Corporate Income Tax Holiday

100% exemption from corporate income tax for ten consecutive years starting from the date of commercial operations startup.

0% Customs Duty On Plant & Machinery

Zero customs duties and sales tax on import of capital goods, silicon fabrication machinery, and industrial equipment.

100% Profit & Dividend Repatriation

Full freedom to repatriate 100% of profits, capital gains, and equity dividends back to international parent headquarters.

Target Industries

15 Core Tech & Green Manufacturing Sectors

FRTZ is engineered to support high-growth technological pillars requiring robust captive power, clean water, and GPON fiber optics.

Solar PV Manufacturing Clean Energy

Solar PV Manufacturing

Solar PV cell fab, ingot slicing, EVA encapsulation, and high-efficiency PERC / N-type module assembly.

Semiconductor Cleanroom High-Tech Fab

Semiconductor & Silicon Fab

Silicon wafer processing, microchip packaging (OSAT), MEMS sensors, power electronics, and PCB assembly.

AI Data Center Hyperscale Compute

Tier-4 Green AI Data Centres

Tier-4 design standard cloud compute clusters, liquid-cooled AI supercomputers, and cross-border edge nodes.

EV Gigafactory Automotive Hub

Electric Vehicle & Battery Gigafactory

EV 2-wheeler, car & tractor assembly, lithium cell packaging, electric powertrains, and charging hardware.

202.22-Acre Masterplan

Interactive Campus Masterplan

Click any plot on the masterplan map to inspect real-time land availability, power hookups, sector zoning, and submit a plot allocation request.

Zone A: Solar/Renewable
Zone B: Semiconductor
Zone C: Tier-4 Data Campus
Zone D: EV Mobility
Zone E: R&D & HQ
Zone F: Logistics Depot
PLOT A-101 (45.5 Acres) PLOT A-102 (30 Acres) PLOT B-201 (35 Acres) PLOT B-202 (25 Acres) PLOT C-301: TIER-4 DATA CAMPUS (40 Acres) PLOT D-401: EV GIGAFACTORY (50 Acres) PLOT E-501 (15 Acres) PLOT F-601 (20 Acres) FOUNDATION RENEWABLE & TECHNOLOGY ZONE (FRTZ) 202.22-ACRE MASTERPLAN
Selected Plot

Plot A-101

Available
Prime land facing the main 100MW solar collection substation, ideal for BESS battery energy storage or solar module manufacturing.
Sector Zone: Zone A - Solar Microgrid
Plot Area: 45.5 Acres
Power Grid Capacity: 25 MW Clean Grid Direct
Water Hookup: 10,000 Gallons / Day
SEZ Incentive: 100% Tax Exemption
Benchmark Zone Tenants

10 Flagship Anchor Zone Enterprises

FRTZ hosts tier-1 global OEMs, semiconductor packaging hubs, hyperscale data centres, and electric vehicle gigafactories.

Cloud Compute 65% Completed

Tier-4 Green AI Data Centre Campus

OEM Partner: Global Cloud Consortium
Estimated Investment: $500 Million USD
Solar Fab 80% Completed

Solar PV Cell & Module Manufacturing

OEM Partner: Silicon Solar Tech Corp
Estimated Investment: $350 Million USD
Lighting Tech 90% Completed

Solar Street & Security Lighting Assembly

OEM Partner: Smart Light Systems Inc
Estimated Investment: $60 Million USD
STZA Onboarding Journey

Your 9-Step Onboarding Roadmap

From initial Expression of Interest to commercial plant commissioning, our STZA One-Window Desk accelerates approvals within 7 days.

1
Step 01 • Discovery

Explore FRTZ Opportunities

Review 202.22-acre masterplan, SEZ tax incentives, and captive utility power tariffs.

2
Step 02 • Inquiry

Submit Expression of Interest (EOI)

Submit target sector parameters, required land acreage, and power MW demand via portal.

3
Step 03 • Consultation

Executive Consultation Meeting

High-level meeting with FoST Technical Board to customize plot specs & utility connections.

4
Step 04 • Inspection

VIP Site Visit & Heliport Tour

Guided inspection of 202.22-acre plot, 220kV substation, and executive facilities.

5
Step 05 • Clearance

STZA One-Window Fast-Track Approval

Receive formal SEZ Enterprise Certificate granting 10-Year Tax Exemption & 0% Import Duty.

Investor Knowledge Library

Official Download Centre

Access high-resolution architectural masterplans, financial model prospectuses, and STZA legislative fact sheets.

PDF • 14.2 MB

Official Corporate Brochure

Complete overview of FoST developer credentials, STZA framework, and site infrastructure.

PDF • 22.8 MB

Investment Prospectus & ROI Model

Detailed 10-year financial model, tax exemption metrics, and captive utility tariffs.

PDF • 18.5 MB

202.22-Acre Masterplan Blueprint

High-resolution vector zoning layout, plot dimensions, and utility pipeline routes.

PPTX / PDF • 35.1 MB

Executive Presentation Deck

Board-level slides for global OEM investment committees and bank syndicates.

One-Window Portal

Establish Your Facility at FRTZ

Our Executive Facilitation Desk assists international corporations with land allotments, STZA tax exemptions, and utility connections.

Zone Site Office
Foundation Renewable & Technology Zone (FRTZ), Port Qasim Corridor, Pakistan
Direct Investor Hotline
+92 (51) 800-FRTZ / +92 (51) 800-3789

Fast-Track Plot Application

Complete the form below to receive a formal provisional plot allocation proposal within 24 hours.